Kelly Liu
All case studies

Sift · 6sense 2024 Breakthrough Awards · Fastest Time to Value

Project Bullseye — the ABX pilot that hit measurable value in six weeks.

Role
VP, Demand Generation
Duration
6-week pilot
Kelly Liu accepting the 6sense Breakthrough Awards 2024 Fastest Time-to-Value award

Challenge

Sift needed enterprise pipeline acceleration, but the demand engine was optimized for broad mid-market lead capture. The question was whether an ABX motion could be stood up and proven inside one quarter — without disrupting the existing funnel.

Approach

Five operating decisions that made the difference.

  1. 01

    Selected a tight target-account list aligned to enterprise ICP signals from 6sense intent data.

  2. 02

    Designed a 6-week pilot scope with clear go/no-go criteria — meetings completed, pipeline created, cost per opportunity.

  3. 03

    Aligned marketing, SDR, and AE motion around the same account list with a single weekly operating cadence.

  4. 04

    Instrumented the funnel end-to-end so every meeting and opportunity could be traced back to a pilot account.

  5. 05

    Reported weekly to the executive team using a single one-pager — no dashboards, no fluff.

Outcomes

275%1
ROI on ABX initiatives
218%1
Lower cost per opportunity
220%1
Of meetings-completed goal
185%2
More pipeline from targeted accounts

1. As published by 6sense in the official 2024 Breakthrough Award winners announcement. 2. From Project Bullseye internal performance reporting.

Want a program like this for your company? Let’s talk.